Advanced nuclear · India

Small Modular Reactors for India’s Energy Future

Reliable, low-carbon power, designed for the needs of a growing India.

Catalyst SMR is working to advance small modular reactor (SMR) solutions for India through technology collaboration, responsible project development and engagement with the country’s regulatory framework. Our focus is to explore how advanced nuclear energy could complement India’s power system, supporting dependable electricity for industry, infrastructure and communities while contributing to long-term decarbonisation.

How a modular plant fits together

Tap a part
GRID CONTROL · TURBINE COOLING REACTOR BUILDING

Generic schematic. Not a design for any specific project.

≈ 8.8 GWApproximate operating nuclear capacity in India today
100 GWNational nuclear ambition stated for 2047
5 SMRsIndigenously developed units targeted by 2033 under the Nuclear Energy Mission
≤ 300 MWeIAEA upper range for a “small” reactor unit

Figures reflect public government and IAEA statements and are approximate. Check current sources before relying on them.

Why SMRs

A new approach to nuclear power

Small modular reactors are advanced nuclear power systems designed around smaller generating units and modular construction concepts. Depending on the technology and project design, they may offer options for phased development, flexible siting and integration with other energy sources.

Phased development

Capacity can be added module by module as demand grows, so investment and construction can follow the load rather than lead it.

Flexible siting

Smaller units and, in some designs, smaller emergency planning zones may widen the range of locations worth assessing, including industrial clusters.

Factory fabrication

Where designs allow, major components are built in controlled factory conditions and shipped to site, which may reduce on-site construction complexity.

Works with renewables

Firm, low-carbon output can sit alongside solar, wind and storage, and some designs can flex output or supply heat as well as power.

Conventional large reactorSmall modular reactor
Unit sizeTypically about 700 to 1,600 MWe per unitUp to about 300 MWe per unit (IAEA range); many designs are smaller
ConstructionLargely built and assembled on siteMore factory fabrication and standardisation, depending on design
Capacity growthOne large block of capacity at a timeModules added in stages, matching demand
SitingLarge sites with substantial cooling waterRequirements vary by design; some options for dry or hybrid cooling
ApplicationsBulk grid electricityGrid power, industrial heat, captive supply, desalination
MaturityDecades of global operating experienceSeveral designs operating or advancing through licensing; economics still being demonstrated

Every project must be assessed on its own technical, economic, safety and regulatory merits. We are building the partnerships and project foundations needed to evaluate these opportunities for India.

India focus

Our India focus

India’s energy demand is expanding alongside its manufacturing, digital infrastructure and urban development. Meeting that demand will require a diverse mix of reliable energy sources.

How Catalyst SMR is exploring the potential

  • Technology and engineering collaborationWorking with qualified partners on reactor concepts, safety cases and adaptation to Indian conditions.
  • Feasibility studies and site assessmentStructured evaluation of sites, grid connection, cooling, logistics and project economics.
  • Skills development and knowledge exchangeBuilding the engineers, technicians and operators a nuclear programme depends on.
  • Engagement with Indian institutions and relevant authoritiesEarly, open dialogue with regulators, government bodies and research institutions.
  • Evaluation of applications for industrial and infrastructure power needsMatching load profiles to what different SMR designs can credibly deliver.

Why firm, low-carbon power matters

Solar and wind are scaling quickly in India, and will remain central. Industry, data centres, rail and cities also need power that is available around the clock. Nuclear energy is one of the few low-carbon sources able to deliver that kind of firm supply at scale.

A sector that is evolving

The Government of India has stated an ambition of around 100 GW of nuclear capacity by 2047, announced a Nuclear Energy Mission that includes support for SMR research and development, and enacted new legislation in 2025 (the SHANTI Act) to widen participation in the sector.

The exact scope of any participation is defined by law, rules, licences and approvals. We follow them.

Any future project would proceed only in accordance with applicable Indian laws, regulatory requirements and government approvals.

About us

Three decades of nuclear experience, focused on India’s next chapter

Nuclear energy rewards patience, discipline and respect for evidence. Our team has spent a career working in exactly that environment.

30+years of experience in nuclear energy

Built inside India’s own institutions.

Catalyst SMR is led by people who have spent more than three decades in nuclear energy and who have served government organisations in India across the defence and nuclear fields. We know how the system works from the inside: the standards, the approvals, the discipline and the responsibility that come with nuclear technology.

Now we are applying that experience to a new question: how small modular reactors could serve India’s industry, infrastructure and communities, safely and in full compliance with Indian law.

What that experience brings to every project

Safety before enthusiasm

Years in fields where margins for error are small shape how we judge designs: evidence first, claims second, and independent review as standard.

Knowledge of Indian institutions

We understand how government bodies, regulators and research organisations work, and how to engage them early, openly and correctly.

A security-minded culture

Experience across the defence and nuclear sectors informs how we plan physical protection, information security and control of materials.

Long-term thinking

Nuclear programmes run for decades. We plan for fuel, people, supply chains and the full lifecycle from the first study.

Why partners talk to us

Technology providers

An India-based team that knows the landscape, can explain the regulatory path, and treats technical scrutiny as normal.

Institutions and industry

A counterpart that values training, knowledge exchange and Indian participation in engineering, construction and supply.

Authorities and communities

A team committed to transparency, to following the rules as written, and to answering hard questions plainly.

The experience described reflects the professional backgrounds of our team members. Catalyst SMR is a private company and does not represent, or act on behalf of, any government body.

Fundamentals

How nuclear power works

A nuclear reactor is a controlled heat source. Splitting heavy atoms releases heat, and from that point the plant works like any thermal power station: heat makes steam, steam turns a turbine, and a generator makes electricity. Step through the chain.

Why so little fuel?

Fission releases millions of times more energy per atom than burning does. A kilogram of reactor fuel can release more than 100,000 times the heat of a kilogram of coal. That is why a nuclear plant needs a few truckloads of fuel a year, where a coal plant of the same size needs trains of it every day, and why fuel transport and storage are small, manageable problems compared with the fuel volumes of fossil plants.

Values are approximate. Nuclear fuel energy depends on enrichment and burnup; the figure shown assumes a typical light-water burnup of 50 GWd per tonne.

Heat released per kg of fuel, MJ (log scale)
Fundamentals

Controlling the reaction

Reactor power depends on how many neutrons go on to cause another fission. Control rods absorb neutrons. As the core heats up, physical effects also push the reaction down on their own. Move the rods, switch the feedback off, then trip the reactor.

Illustrative reactor core
COOLANT AND FUEL ASSEMBLIES CONTROL RODS (DRIVEN FROM ABOVE)
35%
Reactor state
Critical65%

Decay heat after shutdown
1 hour

Way–Wigner approximation after one year of operation. Illustrative 250 MWth module. Even after fission stops, the fuel keeps producing heat, so cooling must continue. This is why passive heat removal matters.

Technology landscape

Reactor families under assessment

“SMR” covers a wide range of technologies, designs and project approaches. These are the main families we study with technical partners. Listing a family here does not mean it has been selected for any project.

Design and passive safety

What smaller can change in the design

Smaller reactors are not just scaled-down versions of large ones. Many designs use the lower power to simplify systems and lean on physical processes for safety. Which features apply depends entirely on the technology selected.

Integral primary circuit

Steam generators and pressuriser sit inside the reactor vessel in some designs, removing large external coolant pipes and the accidents associated with them.

Natural circulation

Hot coolant rises and cool coolant sinks. Some designs use this to move heat without main coolant pumps.

Lower heat and inventory

A smaller core holds less radioactive material and produces less decay heat, which makes it easier to cool without power.

Below-ground placement

Some designs place the reactor in a pool or silo below grade, adding protection against aircraft, missiles and extreme weather.

Fewer active components

Fewer pumps, valves and support systems mean fewer things to fail and maintain, in designs that pursue simplification.

Factory-tested modules

Building and testing in a controlled factory can improve quality and find defects before the module reaches the site.

Scenario: all site power is lost (a “station blackout”)

Generic sequence for a design with passive decay-heat removal. Real timings and systems differ by design and must be demonstrated in the safety case.

Safety and responsibility

Safety, security and responsible stewardship at every stage

These principles must guide every stage of nuclear energy development, from the first concept study to decommissioning.

Respect for India’s regulatory framework

We plan around the consents, standards and oversight the regulator requires, and engage early rather than late.

Independent technical scrutiny

Safety cases and design claims should be reviewed by qualified parties who are independent of the people proposing them.

Careful assessment of site and environmental conditions

Seismic, geological, hydrological, ecological and population factors shape whether a site is suitable at all.

Security-minded project planning

Physical protection, cyber security and material safeguards are designed in from the start, not added later.

Transparent engagement with relevant stakeholders

Communities, local authorities and institutions deserve clear information and a real channel for questions.

Responsible management of materials and lifecycle

Fuel handling, used-fuel management and decommissioning are planned for before construction begins.

1

Defence in depth

Nuclear safety relies on several independent layers. If one fails, the next still protects people and the environment. Select a level.

Security and safeguards

Physical protection

Layered barriers, detection and response, sized to credible threats and reviewed by the authorities.

Cyber security

Digital control systems are designed with isolation of safety functions, defence in depth and continuous monitoring.

Safeguards

Civil facilities placed under international safeguards are subject to material accounting and inspection by the IAEA.

Specific safety arrangements and project commitments depend on the technology selected, the project design and the applicable approvals.

Fuel and waste

The fuel cycle, front to back

A credible project plans for fuel from the first day. Where it comes from, how long it lasts in the reactor, and what happens afterwards all shape cost, security and public confidence.

Front endReactorBack end

India’s three-stage nuclear programme

India’s long-term policy links reactor types so that the output of one stage becomes the fuel of the next, with the aim of using the country’s large thorium resources. Any SMR assessment has to consider where it fits.

Stage I

Pressurised heavy-water reactors

Run on natural uranium and produce plutonium in their used fuel. This is the base of India’s current fleet.

Stage II

Fast breeder reactors

Use plutonium from Stage I to generate power and to breed more fuel, including uranium-233 from a thorium blanket.

Stage III

Thorium-based reactors

Advanced reactors that run mainly on uranium-233 bred from thorium, aimed at long-term domestic fuel security.

Approach

How we are approaching the work

Four connected stages take an idea from technology screening to a project foundation that regulators, partners and communities can scrutinise. The order matters: each stage informs the next.

Planning

How siting trade-offs work

No site is best on every measure. Decide what matters most for a given project, and the ranking changes. Adjust the weights to see how four common kinds of location compare.

What matters most? (0 = ignore, 5 = critical)
Weighted fit, generic site types

Seismic, geological and flood suitability are always site-specific and can rule a site out entirely, so they are not scored here. Scores are qualitative judgements for generic site types. No real site has been assessed or selected.

Planning

Firm power on a grid with a lot of solar

Solar peaks at noon, demand peaks in the evening. The gap is what firm, low-carbon capacity is for. Change the mix and watch the evening peak.

Illustrative 24-hour system (demand peak = 100)
70
25
25

Synthetic profiles for illustration, not forecasts for any state or grid. Capacities are in the same units as demand. Must-run nuclear is dispatched first, so extra midday solar is curtailed. “Other” stands for hydro, gas, storage or imports.

Economics

What drives the cost of nuclear power

Nuclear is capital-heavy: most of the cost is paying back construction. That makes three things dominate the result: how much it costs to build, how cheaply it is financed, and how long construction takes. Test the levers.

Inputs (illustrative defaults)
Levelised cost of electricity
₹4.2per kWh

What moves it most (each input ±20%)

Simplified model for explanation only: annualised capital with interest during construction, fixed and variable costs. It leaves out taxes, decommissioning and waste funds, grid and land costs, and inflation. First-of-a-kind SMR costs are uncertain, and cost reduction depends on repeat construction, which has to be shown in practice.

Delivery

From assessment to operation

A project moves through stages, and each ends in a decision. Nothing proceeds to the next stage until the evidence supports it and the approvals are in place.

  1. Current focus

    Phase 0 · Assessment

    Screen technologies and partners. Agree what would make a project worth pursuing.

    Gate: technology shortlist
  2. Current focus

    Phase 1 · Feasibility

    Site, grid, cooling, workforce and economics studied in detail. Early regulator and stakeholder dialogue.

    Gate: feasibility case
  3. Subject to approvals

    Phase 2 · Licensing and pre-project

    Design finalised, safety case reviewed, consents sought, financing and supply chain arranged.

    Gate: regulatory consent and financing
  4. Subject to approvals

    Phase 3 · Construction

    Site works, module fabrication, transport, installation and commissioning under regulatory hold points.

    Gate: authorisation to operate
  5. Subject to approvals

    Phase 4 · Operation and lifecycle

    Operation, periodic safety review, refuelling, used-fuel management and eventual decommissioning.

    Gate: ongoing regulatory oversight
Construction schedule: site-built versus modular (illustrative, months)

Illustrative shapes only, not a Catalyst SMR schedule. Modular construction aims to move work off site and run it in parallel. First projects of any new design have often taken longer than planned, which is why repeat builds and supply-chain readiness matter.

Regulatory pathway

Consents come in stages, each needing evidence

In India the nuclear regulator grants consent step by step across the life of a facility. Select a stage to see the kind of evidence usually involved. Other approvals run alongside.

TrackWhat it coversWhy it matters for an SMR
Nuclear regulatorStaged consents from siting to decommissioning, plus safety review of the designRegulatory guidance for new SMR concepts continues to develop, so early dialogue reduces rework.
EnvironmentEnvironmental impact assessment, public consultation and clearance; coastal rules where relevantCooling water, thermal discharge and ecology shape the site and design.
Land, water and stateLand acquisition or lease, water allocation, state and local permissionsSmaller footprints may simplify some of these, but they still take time.
Liability and insuranceCivil nuclear liability and insurance arrangements under the applicable lawThe legal framework was updated in 2025. Terms for operators and suppliers must be clear before commitments are made.
Security and safeguardsPhysical protection, cyber security, material accounting and international safeguards where applicableDesigned in from the start, and reviewed independently.

Summary for orientation only. Requirements are set by Indian law, regulations and the regulator’s guidance, which change over time. Always confirm the current rules with the relevant authority.

Potential applications

Where SMRs may be evaluated

Subject to technical feasibility and regulatory approval, SMRs may be evaluated for the applications below. These are areas for assessment, not confirmed project deployments.

Illustrative tool

Phased capacity planner

See how modular units could be sized and added in phases to meet a given demand. Move the sliders to test different assumptions.

400 MW
2
5Modules
500MWe installed
25%Headroom
400MWe firm*

    *Capacity available with the largest single module out of service. Illustrative arithmetic only. Real sizing depends on the technology, load profile, availability, site limits, regulation and economics. This is not a design or a commitment.

    Building Indian capability

    People, institutions and long-term technical capability

    A successful nuclear energy programme depends on people, institutions and long-term technical capability. We aim to support knowledge exchange and explore opportunities for Indian participation in engineering, construction, operations, research and supply chains, subject to project requirements and applicable policy.

    • Engineering
    • Construction
    • Operations
    • Research
    • Supply chains

    People

    Training pathways for nuclear engineers, reactor operators, quality and safety specialists, and skilled trades, built with institutions that already teach these subjects.

    Institutions

    Joint work with universities, national laboratories and research bodies on safety analysis, materials, fuels, digital controls and environmental monitoring.

    Supply chain

    Mapping where Indian manufacturers can supply forgings, pumps, valves, instrumentation, civil works and services to nuclear quality standards.

    Knowledge exchange

    Technical secondments, workshops and shared standards so that experience from other countries is adapted to Indian conditions and rules.

    Where Indian supply chains could take part

    Component categories we would assess with partners. Participation depends on each project’s requirements, quality standards and applicable policy.

    CategoryExamplesWhat we would assess
    Heavy forgings and vesselsReactor pressure vessel, steam generator shellsNuclear-grade materials, qualified suppliers, inspection capability
    Primary componentsHeat exchangers, pumps, valves, pipingQuality assurance records, testing facilities, delivery capacity
    Instrumentation and controlProtection systems, sensors, digital controlIndependence, qualification, cyber security, long-term support
    FuelPellets, cladding, assembliesEnrichment route, fabrication licence, supply security
    Civil and modular fabricationFoundations, structures, module assembly yardsHeavy-lift logistics, steel and concrete quality, workforce
    ServicesEngineering, inspection, maintenance, trainingQualified people and programmes at the required scale
    Risks

    What could go wrong, and how we plan for it

    Naming the risks early is part of responsible development. These are the main categories we track, with the way we would reduce each.

    Work with us

    Start a conversation

    We welcome discussions with technology providers, research institutions, engineering firms, industry partners and other organisations interested in the responsible evaluation of SMR opportunities in India.

    Technology providers

    Reactor designers and vendors seeking an India pathway.

    Research institutions

    Joint studies, training and independent review.

    Engineering firms

    Design, EPC, siting and regulatory support.

    Industry partners

    Energy users exploring firm, low-carbon supply.

    Public bodies

    Authorities and agencies engaged in energy planning.

    Contact our team

    Tell us who you are and what you would like to explore. We read every message and will reply to relevant enquiries.

    Email[Email address]
    Phone[Phone number]
    Office[Office address]
    Please enter your name.
    Please enter your organisation.
    Enter a valid email address.
    Enter a valid phone number.
    Please choose a type.
    Areas of interest
    Please add a short message (at least 20 characters).
    Please confirm to continue.
    Frequently asked questions

    Straight answers

    Search the questions, or browse the key terms alongside.

    Further reading

    Important notice

    Information on this website describes exploratory and development activities. It is not an announcement of an approved nuclear power project, a guarantee of project delivery, or an offer to sell securities or investment products. Project scope, technology, location, schedule and capacity may change as assessments and regulatory processes progress.